  This step by step tour will give you an idea of the different stages a loft converion undertakes.
 
 
 
Dormer
   
click to enlarge   click to enlarge   click to enlarge
Tiles are removed to allow us to feed the supporting beams through.

The frame work of the dormer is built.
Main Beams
 
click to enlarge   click to enlarge

Vertical Beams are installed that act as the main support for the ceiling, and also tie the ceiling into the floor.

Each Beam is scured into place with heavy duty connecting striops which are drilled into place.

Ceiling / Ensuite Bathroom
 
click to enlarge   click to enlarge

Beams are run along the top of the loft to create the ceiling that are tied into rest of frame work.

The Ensuite framework is then erected into position and any pipework routes are worked out.