The old roof is taken out and the the dormer is boarded.
The felt is applied to roof making it weather proof!
The Shower taps and pipe work are fitted to the framework in position.
The hot and cold feeds are run and connected to existing pipes.
The pipes are then run through to the outside of the dormer in position for the guttering.